elk-grove-promenadeATS was hired to set up a Stormwater Treatment System for the Elk Grove promenade which was a 110 acre commercial property located in Elk Grove, CA. ATS design was for three (3) ATS systems that treated a combined 1800 gpm. 

The system was designed to monitor for both turbidity and pH. ATS treated from a 2 compartment basin built with a berm for separation. This allowed for treatment and flocculation to occur in one half of the basin then to be pump through the advanced treatment systems. Over 11.5 million gallons was treated during 2007/2008.